The Production

KE-2
Founded in 1982, KE-2 currently produces 250 bopd of crude oil with the peak rate at 11.000 bopd.

KE-5
Founded in 1983, KE-5 currently produces approximately 150 bopd of condensate and 8 mmscfd of natural gas and condensate are transported through 14 inch, 65 km pipeline to Onshore Receiving Facilities (ORF) at Gresik.

Poleng Field Technical Assistance Contract (TAC)
Kodeco has a 50% stake in licensed areas located in Poleng Field near the island of Madura. Approximately 3.600 bopd of crude oil and 65 mmscfd of natural gas are currently being produces from two fields (AW and BW). The crude oil is transported to FSO tanker, while the natural gas is distributed to PLN Gresik.

KE-23
In November 2001, Kodeco commenced production from the successful discovery KE-23 field. Production rates from this field currently at 10.000 bopd with 18 mmscfd gas from 4 wells. The field produces to the common facilities at AW platform. A number of upgrades to the processing facilities on the field were made in 2001. These upgrades are expected to provide a more stable flow in the production system and, ultimately, enhance Kodeco’s production capacities.

KE-40
Newly developed field that is scheduled for its first oil production at the end of 2004. The approximate peak rates are 5.000 bopd of crude oil and 30 mmscfd of natural gas that will be processed in KE-5 CPP. Separated gas will be transferred to ORF, and the crude oil to Poleng AW Platform.

KE-30
Another newly developed field that is scheduled for its first oil production at the end of 2005. The approximate production from this field at the peak rate are 3.750 bopd of crude oil and 8 mmscfd of natural gas.

New Plan of Development (POD)
Commencing in late 2007, the new PODs (KE-32, KE-38, KE-39, and KE-54) are going to produce approximately 134 mmscfd of natural gas at the peak rate and 2.000 bopd of oil / condensate respectively.

Gas Expansion Phase II
Kodeco plans to install new compressor at AW Platform in 2007 to accomodate daily sale rate of 140 bbtu or 125 mmscfd of natural gas. Tis is as an addition to the 14 inch, 65 km pipeline from CPP to ORF that will accomodate gas sale rate of 200 bbtu or 175 mmscfd of natural gas.

Madura Jaya
Operating in Poleng Field, Madura Jaya functions as temporary floating storage tanker for crude oil with a capacity of 600.000 barrels. Periodically, a shuttle tanker will carry the crude oil and export it to certain locations.

Onshore Receiving Facilities (ORF)
Kodeco has the exclusive use of an onshore processing plant in Gresik, which consists of facilities for final processing of condensate and gas streams from its offshore facilities into separated condensate and natural gas. The condensate is stored in two tanks each with a 10.000 barrels capacity and is periodically transported along a 1,5 km pipeline to PLN Gresik Power Generation Plant. To anticipate an increase in gas sales contracts, Kodeco has begun plans to upgrade its gas gathering and export system.

 

 

  Contact Us  
     
 


Kodeco Energy Co., Ltd

Jakarta Office

Indonesia Stock Exchange Building - Tower 1

23rd Floor
Jl. Jend. Sudirman Kav.52
Jakarta 12190, Indonesia

Phone: +62-21-5159277
Fax    : +62-21-5151175

           +62-21-5159589
E-mail:
info@kodeco.co.id

 

Gresik Office

Jl. Amak Khasim

Desa Sidorukun

Gresik 61112

Jawa Timur

Phone: +62-31-3984804
Fax    : +62-31-3987953

 
     
 
 
Home   |   About   |   Production   |   Community Development   |   Tender Announcement   |   H. S. E.   |   Work With Us   |   Contact Us   |   E-Procurement   |   Web Mail
 
Copyright © 2007 Kodeco Energy Co., Ltd. All rights reserved.